How will water run-off and weeds be managed by the project?

A preliminary surface water study was undertaken as part of the project’s feasibility study. The results showed that surface water traversing the site is generally slow, shallow and wide spreading. Given that the solar structures are elevated 2m in height and supported by poles, the large clearance underneath the structures will ensure that water can … Continue reading How will water run-off and weeds be managed by the project?